01

Property IQ

Check whether a parcel is a deal worth making before you write an offer.

Property IQ walks you through four screens, then writes a Development Feasibility Assessment. Stay on the page while it runs. Use Back on any screen if you need to change an earlier answer. Running it does not create a Workspace project, a budget, or an offer.

Tell us about the property

The first screen is titled Tell us about the property.

  1. Click Street Address and type the street number and name. This field is required for a parcel lookup. If you only want a market-level read, you can leave the street blank and fill in the ZIP in the next step.
  2. Click City and type the city.
  3. Click State and type the two-letter state, such as IL.
  4. Click Zip Code and type the five-digit ZIP. This field is required.
  5. Wait a moment. If parcel data is found, a parcel preview appears under the address. A comps preview can appear as well.
  6. Click Next: Project Type.

What are you planning to do

The second screen is titled What are you planning to do?.

  1. Under Project Type, click one card. The choices are Buy to Live In, Fix & Flip — Full Reno, Fix & Flip — Cosmetic, Teardown + New Build (single family), Teardown + New Build (multi-family / ADU), ADU Addition, Lot Split / Subdivision, Conversion, Commercial Conversion, and Ground-Up Construction. Buy to Live In starts selected.
  2. Under Exit Strategy, click one pill. The pills change to match the project type you just chose. A buy-to-live plan offers live-in choices. A flip offers sell, rent, or live-then-sell. A developer plan offers sell completed units, hold as a rental portfolio, or sell with entitlements.
  3. Click Next: Financials.

Your numbers

The third screen is titled Your numbers. Every field on this screen is optional. Fill in what you know. The more you enter, the tighter the assessment.

  1. Click Purchase Price ($) and type the price you are considering. Do not type a dollar sign.
  2. Click Improvement / Renovation Budget ($) and type what you plan to spend after you buy. The label can change with the project type.
  3. If this is a developer plan, click Number of Units Planned and type the unit count.
  4. If this is a developer plan, click Target Profit Margin (%) and type a percent. A typical developer target is 15–25.
  5. Click Notes and type anything the analysis should weigh: condition, a known problem, or a deadline.
  6. If you are paying cash, leave the financing switch off and skip to the next button.
  7. If you are borrowing, click the switch labeled I’m using financing (not paying cash). A Financing Details block opens.
  8. Click Loan Type and choose one: Conventional (5–20% down), FHA (3.5% down), VA (0% down), Construction Loan, Hard Money, DSCR / Investment, or Bridge Loan.
  9. Click Down Payment / Equity (%) and type the percent of the purchase price you are putting in.
  10. Click Interest Rate (%) and type the rate, such as 7.25.
  11. Click Loan Term (years) and choose 30, 20, 15, 10, 1 year (bridge / hard money), or 2 years.
  12. Click Next: Photos.

Site photos

The fourth screen is titled Site photos (optional). You can skip the photos and still run the analysis.

  1. Click the box that says Drop site photos here or click to browse (optional), or drag JPG, PNG, or WEBP files onto it. Photos of the lot, the street, and the existing building are the useful ones.
  2. Check the thumbnails. If one is wrong, remove it before you continue.
  3. Click Analyze This Deal.
  4. Leave the page open. The screen says Analyzing with Brixzly AI… while it runs the parcel lookup, market comps, and the feasibility assessment.
  5. If you are not logged in, a window may open that says Your Property IQ report is ready! Create a free account, or log in, to see and save the full report.

Read the report

The result is titled Development Feasibility Assessment, with the address under the title. Read it from top to bottom.

  1. Read the Feasibility Score out of 10 and the sentence under it.
  2. Read the deal metrics strip under the score.
  3. Read Exit Strategy Assessment if it is shown.
  4. Read Development Scenarios.
  5. Read Zoning Analysis.
  6. If you uploaded photos, read Site Conditions.
  7. Read Red Flags if that section appears.
  8. Read Recommended Due Diligence for what to verify before you write an offer.
  9. Read Market Context.
  10. If you turned financing on, read Financing Analysis.
  11. Read Long-Term Value Forecast and Parcel Data when those sections are present.
  12. Click Print / PDF to print or save a PDF. Click + New Analysis to start over on another address.
02

Renovation ROI

Photograph a space and get a renovation cost and return analysis.

Renovation ROI is a four-step form. The step bar at the top shows Space Type, Property Info, Photos, and Context. You can click ← Back on steps 2, 3, and 4. Log in before you run it if you want the result saved under My History. The analysis does not create a bid, a budget line, or a contractor.

What are you renovating

Confirm the + New Analysis tab is selected. The first screen asks What are you renovating?

  1. For one room, click the Single Room card. It opens a row of rooms. Click one: Kitchen, Bathroom, Basement, Exterior, Living Room, or Other Room. A locked room shows Upgrade. That room is not on your plan.
  2. If you clicked Other Room, click What type of room is this? and type the room, such as Garage or Home Office. This field is required for Other Room.
  3. Read the Photo Tips under the room you picked. They tell you which angles to shoot.
  4. For two to five rooms, click the Multi-Room Plan card instead of a single room.
  5. For a whole-home investor assessment, click the Full Home Rehab card.
  6. Click Next: Property Info →.

Tell us about your property

Only Zip Code and the goal are required. The rest sharpen the comps.

  1. Click Property Address and type the address if you want it stored with the result. This field is optional.
  2. Click Zip Code and type the ZIP. After you leave the field, a market snapshot may appear.
  3. Click Bedrooms and choose 1 through 6+, or leave — Any —.
  4. Click Total Home Size and type the square footage of the whole house, if you know it.
  5. Click Current Home Value and type your estimate. The dollar sign is already in the box.
  6. Click Purchase Price and type what you paid, if you want that in the math.
  7. Click Year Purchased and type the year.
  8. Click Space Size and type the square footage of the room you are renovating.
  9. Click Max Budget and type the most you will spend.
  10. Under What’s your goal with this property?, click one card: Stay long-term (5+ years), Sell in 2–5 years, Sell within 18 months, or Rental property. Stay long-term starts selected.
  11. Click Next: Upload Photos →.

Upload photos

For a single room or a multi-room plan, the screen says Upload photos of the space. For a full home rehab, it says Upload photos by room.

  1. For a single room, click the box that says Drop photos here or browse, or click browse. Choose JPG, PNG, WEBP, or GIF files. Add a wide shot and close-ups of damage or dated finishes.
  2. Look at the thumbnails under the box. Remove any photo that is the wrong room before you continue.
  3. For a full home rehab, type the room name on the first room card, upload 1–5 photos for that room, then click + Add Another Room and repeat until every room you want priced is listed.
  4. Click Next: More Context →.

Additional context and the result

The last screen is titled Additional context (optional).

  1. Click Comparable Sales / Market Notes and type what nearby homes have sold for, or anything else the analysis should know. You can leave this blank.
  2. Click Analyze with Brixzly AI. If the button instead says Log in to Run Analysis, click it, log in, and come back to this step.
  3. Stay on the page. It says Analyzing photos with Brixzly AI… and usually takes 20–40 seconds. Do not close the tab.
  4. Read the result from the top: the cost range, the value change, and the recommendations for the room or rooms you uploaded.
  5. To open an older run, click the My History tab. Type in Search… or use the All Spaces menu to filter. Click a card to open that assessment.
04

Contract & Bid Document Analysis

Upload a contract, bid, or proposal and read an AI analysis of the document.

This tool has two tabs at the top: Single Document Analysis and Document Comparison. Single Document Analysis is already selected. Use it for one contract, bid, or proposal. Use Document Comparison when you have two versions and need to see what changed. Stay on the page while it says Uploading document…, Analyzing document…, or Comparing documents…. The analysis does not sign the document, and it does not file it on a project until you click Save to Workspace and pick the project.

Analyze one document

  1. Click the Single Document Analysis tab. It is selected when you first open the page.
  2. Click the box that says Choose a legal document or drag & drop here, or drag the file onto it. The allowed types and the size limit are printed under that sentence.
  3. Check Selected file: and File size:. If the file is wrong, choose a different one before you continue.
  4. Or click Upload from Computer to open the file picker. If the file is already in a project, click Select from Workspace and pick it there instead.
  5. Click Start Analysis.
  6. Read the analysis from the top. Look for the obligations, the dates, and anything marked for a second look before you sign or award the work.
  7. Click Print if you want a paper or PDF copy.
  8. Click Save to Workspace if you want the analysis filed on a project. In the window titled Save to Workspace, click the project. The file goes in that project’s Document Comparisons folder. Click Cancel to close the window without saving.

Compare two documents

  1. Click the Document Comparison tab. If your plan cannot compare right now, a warning titled Document Comparison Temporarily Unavailable explains why. Stop here and use Single Document Analysis, or upgrade.
  2. Under Documents to Compare, find Document 1. It says No file selected until you add a file.
  3. Click Upload from Computer on Document 1 and choose the first file, usually the original. Or click Select from Workspace and pick a file already stored on a project.
  4. Repeat that on Document 2 with the revised file.
  5. You can also drag both files onto the Drag & Drop Zone. They fill the empty slots in order.
  6. If a slot has the wrong file, click Remove on that slot and choose again. Click Download on a slot if you want a copy of the file you just attached.
  7. Click Compare Documents. The button stays off until both slots have a file.
  8. Read the comparison. Differences between the two files are the point of this tab.
  9. Click ← New Comparison when you want to clear both slots and start over.

Open an older analysis

  1. Click My Previous Analyses.
  2. Click an item in the list to open it.
  3. To delete several, click Select all, or check the ones you want gone, then click Delete selected.
05

Drawing Analysis

Upload drawing PDFs and review the findings sheet by sheet.

Drawing Analysis reads PDF sheets. A multi-page PDF is split into one sheet per page, and each page counts toward your sheet limit. Do not leave the page once you click Analyze. A full set can take several minutes. The run does not price the job and does not create a bid package. Analyze → stays off until at least one sheet is attached.

Add the sheets

  1. Log in first if you want the run saved. The banner at the top says so, with Create a free account and log in links. If the page says Members Only, click Login or Upgrade Membership.
  2. Click the area that says Drag & drop your drawing sheets here, or drag PDF files onto it.
  3. Or click Browse Files and choose one or more PDFs from your computer.
  4. If the drawings are already in a project, click From Workspace. In the window titled Select Files from Workspace, choose the Project, click the files, then click Add Selected. Click Cancel to close without adding.
  5. Look at the file chips under the drop area. Remove a chip if that sheet should not be in this run. The note under the drop area states the maximum number of sheets for your plan.
  6. Optional: click Add a custom analysis prompt (optional). A text box opens. Type what you want the read to focus on, such as conflicts between structural and MEP sheets. Leave it unchecked if you want the standard read.
  7. Optional: turn on Save to Workspace if you want a copy of the uploaded PDFs kept. Then choose the project in the Workspace project menu that appears.

Run it and read it

  1. Click Analyze →. The button stays off until at least one sheet is attached.
  2. If a limit notice appears, choose one: Use Premium Run to spend tokens and continue, Continue with plan limit to analyze only what your plan allows, or Cancel to stop and remove sheets.
  3. Watch the progress steps: Uploading, then Preparing, then the analysis. The page tells you not to close it.
  4. When it finishes, read the findings sheet by sheet. Start with anything flagged before you price or build from those drawings.
  5. To run a revised set, go back to the drop area, remove the old chips, add the new PDFs, and click Analyze → again.
06

My Workspace

Run the project from one place: notes, bids, contractors, schedule, budget, field, and documents.

Open My Workspace and click the project name at the top left. Every tab below belongs to that project. If the project you want is not listed, open the menu and choose it, or create one, before you use the tabs. The tabs run left to right: Notes, Bids, Contractors, Schedule, Budget, Change Orders, Draw Requests, Pay Applications, Permits, Field, and Documents.

The buttons on the top right are not tabs. Chat and Share belong to the project that is open. The tray icon is messages from every project. The bell is notifications and alerts from every project. The initials button is the account: email sending, company profile, and sign out. Those three follow the person, not one project.

Chat

Chat is a conversation with people already on this project. Sending a message does not email them, and it does not change the schedule or the budget. To add someone who is not on the project, use Share.

  1. Open the project the conversation belongs to.
  2. Click Chat. The button’s hint is “Team chat.” A number on the button is how many unread messages this project has. Above 9 it shows 9+.
  3. If the panel says Connecting to collaboration server…, wait. If it says chat will be available after the project is linked to a collaboration board, this project is not ready for chat yet.
  4. The list on the left is titled Chat. All Team is the thread everyone on the project can read. Direct and Groups appear only after those conversations exist.
  5. Click All Team, or click a name under Direct or Groups.
  6. Click the box that says Message… (Enter to send, @ to mention) and type the message. Press Enter to send. The send button stays off until the box has text. Hold Shift and press Enter for a new line without sending.
  7. Type @ and pick a person to mention them. A mention does not email them. It can show up on their bell.
  8. To attach a file, click the button whose hint is Attach file or link. Storage is a file already on the project. From device opens Choose file….
  9. On a message you sent, Edit changes that message. Save keeps the edit. Cancel drops it. Delete removes that message.
  10. A direct message or a group can be deleted. The button’s hint is Delete conversation. It asks Delete? Click Yes or No. All Team cannot be deleted.
  11. To start a private thread, click the + whose hint is New conversation. Check the people. The button reads Select members until at least one person is checked, Open DM for one person, and Create group plus the count for two or more. If the list says No other board members., nobody else is on this project yet.
  12. Click Close, or click the dim area outside the panel. The messages stay.

Messages

The tray icon, between Share and the bell, is every project’s chat in one list. Its hint is Messages from all projects. It is not the bell, and opening it does not clear alerts.

  1. Click the tray icon. The title is Messages when nothing is unread. When something is unread, the title is the count, such as 3 new messages, and the line under it is how many projects that covers. The other line reads all projects when nothing is unread.
  2. Wait if it says Connecting to collaboration server… or Loading…. If it says No projects with chat set up yet., there is no conversation to open.
  3. Each row is a project, the latest message, and a time. A row with no messages yet says No messages yet.
  4. Click a row. That project’s chat opens, and that row’s unread count clears. The other projects’ counts stay.

Share

Share adds a person to the project that is open. Inviting someone does not send them a bid, a change order, or a chat message. The window title is Share plus the project name.

  1. Click Share. The button’s hint is “Share project.”
  2. If you own the project, the line under the title says you can invite people to view or edit it. Editor is already selected. Open the menu and choose Viewer if they should not edit.
  3. Click the box whose placeholder is colleague@example.com and type their email. Invite stays off until the box has text.
  4. Click Invite. The button reads Sending… while it goes. A line then says Invite sent to that address. If the email cannot be sent, the form says to copy the link instead. The link is still created.
  5. To hand someone a link instead of emailing them, click Generate invite link. The button reads Generating… while it works. The line under the link says anyone with it can join as the role you picked, and that the link expires in 30 days. Click Copy. It changes to Copied! Generating a link does not send an email.
  6. Changing the role after a link is showing clears that link. Generate it again.
  7. Members lists who is on the project, including You. Each row shows the role. To take someone off, click Remove and confirm Remove this collaborator? The project stays. Their access does not.
  8. If you do not own the project, you do not see Invite. The line under the title says you are a collaborator. Click Leave project only if you should lose access. The confirm says you will lose access to this project. Leaving does not delete the project for the owner. The button reads Leaving… while it finishes.
  9. Click Close, or click outside the window, to leave without inviting anyone.

Notifications

The bell is titled Notifications. A number on it is the unread count, or 9+ past nine. Opening the bell marks ordinary notices as seen. Rows that say Needs attention stay, and they keep counting, until the thing they describe is fixed.

  1. Click the bell. The panel title is Notifications. If it says You’re all caught up., there is nothing in the list. Loading… means it is still fetching.
  2. An invite row says who invited you, to which project, and as which role. Click Accept to join. The button reads Joining… while it opens that project. Click Decline to turn the invite down. Decline does not delete their project.
  3. Click any other row to open that project and close the panel. The click does not open the permit, the punch item, or the pay application by itself, and it does not mark that item done.
  4. A × on a row hides that row. Its hint is Dismiss. Dismiss does not fix the item.
  5. Clear alerts shows only when there are message-style rows, such as someone joining or a mention. It removes those rows. It does not remove an invite, and it does not remove a Needs attention row.
  6. A Needs attention row has no ×. It leaves the list only when the condition is gone. The wording tells you which: Permit expiring soon or Permit expired (a permit dated within 30 days, or already past that date, and not closed), Punch item overdue (the due date has passed and the item is not Verified), an RFI that is still Submitted past Needed by, a SUB in the same state, or Lien waiver missing on an approved pay application.

Account

Click the initials at the far right. The hint is Account. The menu shows your name and the email you sign in with. That sign-in email is not the address contractors see until you connect an email account. Click outside the menu to close it.

Email Account

This is the mailbox Workspace sends from. Until one is saved, requests for proposal go out from Parcl9’s own address. Saving one also becomes the From address on change orders and draw requests. Pay-application decision mail still goes from the site address. Connecting an account does not open an inbox inside Workspace.

  1. Click Email Account. The window title is Connect IMAP / SMTP Account.
  2. Email address is required. The placeholder is you@example.com.
  3. From Name is optional.
  4. IMAP Server is required. IMAP Port starts at 993. Use SSL/TLS for IMAP starts checked. Leave it checked unless your mail host told you not to.
  5. SMTP Server can stay empty. Sending then uses the IMAP server. SMTP Port starts at 587. Fill SMTP Server only when outgoing mail uses a different host.
  6. Username can stay empty. The placeholder says it will use the email address.
  7. Password / App Password is required the first time. The form links to Google’s App Password page and says Gmail needs 2-Step Verification. The password is not shown again after you save.
  8. Click Save Account. If email or the IMAP server is empty, the form says Email address and IMAP server are required. If the password is empty on a first save, it says Password is required. A successful save says Saved. RFPs will now send from your own domain. A green line reads Active — sending as that address. Close without Save Account does not connect anything.
  9. After an account is active, Send test email appears. It sends only to the address you saved, not to a contractor. The button reads Sending… and then tells you to check that inbox. You cannot send the test before the account is saved.
  10. To change the account later, edit the fields and click Save Account again. Leave the password blank to keep the current one. The label says so.
  11. Click Remove account to go back to Parcl9’s address. Confirm Remove this email account? RFPs will go back to sending from Parcl9’s default address. The next line says they will send from that default address.

Company Profile

This is the letterhead. The window says the logo and the details appear on generated change-order documents and RFP pricing schedules, and as a signature on outgoing email. The same profile is also placed on draw-request documents. Saving it does not send an email, and it does not change the name in the account menu. There is one profile for the account, not one per project.

  1. Click Company Profile. Wait through Loading….
  2. Under Logo, the box says No logo until a file is there. Click Upload logo. The hint under the button is PNG, JPEG, WEBP, or SVG, up to 2MB. The button reads Uploading… and then Logo uploaded. The file is stored as soon as the upload finishes. You do not have to click Save for the logo. A later file uses Replace logo. Remove takes the logo off and leaves the other fields.
  3. Company Name, Street Address, City, State, Zip, Phone, Email, and Website are all optional. Each box has its own placeholder. None of them is required.
  4. Click Save. The button reads Saving…. The notice says generated documents and email signatures will now use the company’s branding. Close without Save drops the text you just typed. A logo that already uploaded stays.

Sign out

  1. Click Sign out. The session ends and Workspace closes. Projects, notes, the company profile, and a connected email account stay. Signing out does not delete them.

Notes

Notes sit on a canvas for the project that is open. Saving a note does not email anyone, and it does not change the schedule or the budget. If the page says Connecting to collaboration server…, wait. If it says Loading notes…, the canvas is still opening.

Write a note

  1. Click Notes.
  2. Click New Note. The same button sits in the header while Notes is open, and again at the top left of the canvas. Either one opens a window titled New Note.
  3. The Title box is optional. Its placeholder is “Title.” The name you type becomes the label on the card. Leave it blank and the card has no label.
  4. The writing area placeholder is Write your note…. Save stays off until this area has text. A title alone is not enough.
  5. The bar above the writing area is Bold, Italic, Strike, H1, H2, Bullet list, Numbered list, Quote, Code block, and Checklist. Each button’s hint is that name.
  6. The color starts on Yellow. The other hints are Green, Blue, Pink, Purple, Amber, Cyan, and White. The color is the card, not the text.
  7. Click Save. The button reads Saving… while it stores the note. Command-Enter, or Control-Enter, saves too. Click Cancel, or click outside the window, to close without a note.
  8. The card lands on the desktop you are looking at. Drag the top bar of the card to move it. Drag an edge or a corner to resize it. Click a card to bring it in front of the others. The date at the bottom of the card is when it was last changed. A card someone else wrote also shows their initials. The hint on the initials is From and their name.

Icons on the card

Point at the card. A row of icons fades in at the top right. They are hints, not printed labels. Edit, Sharing, and Delete show only on a note you created. Hide, Print, and Share to chat show on every note you can see.

  1. Edit note opens a window titled Edit Note. Change the title, the text, or the color, then click Update. That replaces the same card. It does not make a second note. Cancel drops the edits.
  2. Share note link to chat opens the project chat with a link to this note already in the message box. Nothing is sent until you press Enter there. It does not email anyone.
  3. Hide from your view — others still see it fades the card and adds a hidden badge. The hide is only on this browser. Click the icon again. The hint is now Show on your canvas.
  4. Print note opens the browser’s print window for this card. The note on the canvas does not change.
  5. The people icon is sharing. Its hint starts with Sharing:. The menu title is Sharing. A new note is Only me. Everyone lets the other people on this project see it. Specific people opens a checkbox for each project member. If nobody else is on the project, the menu says No other project members yet. Changing this does not send an email. A note set to Only me is invisible to everyone else.
  6. Delete note asks Delete this note? Confirming removes the card for everyone who could see it. Canceling the question leaves the note.
  7. A checklist box on the card can be checked without opening Edit. That check is saved on the note.

Desktops

The strip under the canvas is the desktops. A desktop is another page of notes for the same project. Notes on another desktop are not deleted. They are just not on the page you are looking at.

  1. The first page is named Desktop 1. Click its name to show that page. An empty page says the desktop name and is empty.
  2. Double-click a name to rename it. The hint is Double-click to rename. Press Enter to keep the new name. Press Escape to put the old name back. If you clear the name, it shows as Desktop 1, Desktop 2, and so on again.
  3. The star next to a name sets the page that opens next time you come back to Notes. The hint is Set as default desktop. A filled star is the default. Click it again to unset it. The hint is then Default desktop (click to unset).
  4. Click +. The hint is Add desktop. You move to the new empty page, and the next New Note lands there. The + goes away after 10 desktops.
  5. With more than one desktop, point at a card and click the icon whose hint is Move to another desktop. The menu title is Move to desktop. The page you are on says here and cannot be chosen. Pick another page. The card leaves this page. It is not copied.
  6. With more than one desktop, a sideways swipe on the canvas moves to the next or previous page. Clicking the name in the strip does the same thing.

Bids

Click Bids. Three buttons sit across the top: Bid Scope, RFP, and Bids. Do them in that order. Sending an RFP does not put money on the budget. Money lands on Budget only after you award a line on the Award step.

Bid Scope

Under Bid Scope there are three buttons: Analysis, Trade Packages, and History. Analysis is the way to build the packages. You drop the drawings, and Brixzly reads them into trade packages. You do not pick a trade first. Trade Packages is where those packages land after you import them. The menu that says Select trade… is only the manual way, on Trade Packages.

From the drawings

  1. Click Bid Scope, then click Analysis. If you already have packages, Trade Packages may be the one that is open. Click Analysis anyway. The screen is the dashed box that says Drop your drawings here, with the line or click to browse — one or more PDFs (a drawing set is often several sheets).
  2. Drop PDF drawings on that box, or click it and choose them. A set is often more than one PDF. Each file you add is listed under the box, with a ✕ to take that file back off. A file that is not a PDF is refused. The message is Please select PDF files. Only PDF drawings and specifications are accepted.
  3. If the drawings are already in the project, click Pick from Storage… under the word or. Open the folder, check the PDFs, and click Add. The button counts the files. It stays off until one is checked. An empty project says No PDFs in project Storage yet.
  4. Click Generate Bid Scope. It stays off until at least one PDF is attached. With more than one file, the button also shows the count. Nothing is saved as a trade package yet.
  5. Stay on the page or switch tabs. The status line moves from uploading the drawings to Analyzing drawings… this can take a few minutes for large sets. A large set can take several minutes. The run keeps going if you leave this screen. ← Try again shows only if the run fails.
  6. When it finishes, each package starts checked. The line above the list says how many of the packages are selected. Uncheck a package you do not want. The trade name is an editable box, so you can correct it. Open a package to read its line items. This review does not create the packages.
  7. The name box placeholder is Name this analysis…. Save to History keeps this read so you can open it later from History. Saving does not create trade packages. The note under the list says the same thing: Save keeps the analysis, Import creates the packages.
  8. Click Import and the package count. The button reads Creating packages… while it works, and it stays off if every package is unchecked. You then land on Trade Packages. Import does not send an RFP, and it does not put money on Budget.
  9. Open a package if you want a budget code on it. The menu says Budget code…. That link is what an award later uses. Leaving it empty does not block the import. If packages have no code, Suggest cost codes appears on the Trade Packages bar and fills them for you to review.

Add a package by hand

Use this when you are not starting from drawings. Click Trade Packages, then + Add Package.

  1. Open the menu that says Select trade… and choose the trade. Choose Custom… if it is not in the list, then type the name in Trade name….
  2. Click Add. It stays off until a trade is chosen, and it reads Adding… while it works. Click Cancel to close the form without a package. This adds an empty package. It does not read a drawing.
  3. Open the package and type the line items. Save appears after you change a line. Until you save, the edits are only on the screen.

RFP

  1. Click RFP. + New RFP is the compose side. Sent History is the other side. Leave + New RFP selected.
  2. Check the packages this email should include. The header checkbox selects every package. The form title reads New RFP, and under it a line counts how many packages are selected.
  3. Click Trade. This field is required. The placeholder is “e.g. Electrical, Plumbing, Framing.” Type the trade this RFP is for.
  4. Click Subcontractor Emails. This field is required. Type an address. The placeholder is “sub@example.com — press Enter to add.” Press Enter, or click Add. Click Contacts to drop in an email from the address book instead of typing it.
  5. Subject is required. It fills in from the trade. Change it if you want a different subject line.
  6. Notes for Brixzly AI (optional) is for the generator, not for the bidder. Type something like “emphasize tight timeline, include site walk offer,” or leave it blank.
  7. Click Generate with Brixzly AI. If Trade is empty, the form says “Enter a trade first.” and does not write the email. The button reads Generating… while it works. Nothing is sent yet.
  8. Read Email Body. It is required. Click Preview to see the email as the bidder will see it, then click Edit to change it.
  9. If packages are checked, a switch appears: Attach pricing schedule as XLSX. Leave it on if you want the bidder to fill in Unit Cost and Total. The line under the switch counts the packages and the items.
  10. A line that starts Still needed: lists whatever is missing. The send button stays dim until that line is gone.
  11. Click Send to 1 sub (the number matches how many emails you added). The next screen says RFP Sent, lists who received it, and names the spreadsheet if you attached one. Click Done.
  12. Sending does not award the work and does not change Budget. Click Sent History and click that RFP to see who it went to and the email body.

Bid responses and award

  1. Click the Bids button inside this tab, not the workspace tab. The cards read Trade Packages, Bids In, Items Awarded, and Committed Value. Committed Value stays at — until something is awarded.
  2. Stay on Bid Responses. When a filled spreadsheet comes back, upload it on the package.
  3. If the number arrived by phone or on paper, click + Add a bid manually. The form fields are Trade Package (required), Contractor (required, placeholder “e.g. ABC Framing Co.”), Email, Amount (placeholder “e.g. 48500”), and Notes. Click Pick from Contacts to fill the contractor and email from the address book. Click Add Bid. The button stays off until a package and a contractor name are set. Click Cancel to close the form. The link then reads Cancel manual entry only while the form is open.
  4. Click Bid Analysis to compare the numbers. Comparing does not award anyone.
  5. Click Award and pick the winner on the line. That is the click that links the amount to the matching cost code. Open Budget afterward. Committed on that cost code can show linked. + CO does not change. Change orders are a different tab.

Contractors

This tab is the project address book. Adding a contact does not invite them to bid. An invitation happens only when you put their email on an RFP.

  1. Click Contractors. An empty list says No contacts yet. Click “+ New Contact” to add your first one.
  2. Click + New Contact. The window title is New Contact.
  3. Type the company, the person, the email, and the phone. The email is what the RFP form can pull in later.
  4. Save the contact. Click Cancel to close without saving. The list does not change if you cancel.
  5. The other way in: on Contractor Search Favorites, click Add to Contacts. The button changes to Added to Contacts and cannot be clicked again. Come back to this tab and confirm the firm is on the project.
  6. Click a contact to edit it. The window title changes to Edit Contact. Saving updates that same card. It does not create a duplicate.

Schedule

A task is a bar on the timeline. Adding a task does not create a budget line, a permit, or a field item. Those can be linked to the task later, from Field or from Budget cash flow.

  1. Click Schedule. The header button Add Task on any other tab only brings you here. It does not open the new-task row by itself.
  2. Click the timeline name. The first timeline is already there. Add another only if this job needs a separate sequence, then click that name so you are editing the right one. Deleting the last timeline is not allowed.
  3. Click + Phase. Type the Phase name, for example Pre-Development, pick a Color, and save. A task can sit in a phase or in none.
  4. Click + Task. A green row opens.
  5. Click Task name. The placeholder is “Task name…”. Type Footings.
  6. Click Start and pick the first day. Click End and pick the last day. End before start will not draw a useful bar.
  7. Click Phase and choose the phase, or leave — None —.
  8. Click Add. Click Cancel to drop the row. Nothing is saved until Add.
  9. For a one-day marker, click ◆ Milestone instead of + Task. The hint is “Zero-duration marker, e.g. a permit issued or inspection passed.” The label changes to Milestone name and a single Date. Type the name, set the date, and click Add.
  10. Click a bar later to change its dates. Click Done when you finish that edit. The budget does not move because a date moved.

Budget

Click Budget. The cards across the top are Original, Changes, Revised, Committed, Actual, Projected, and Variance. Three buttons under them switch the view: Cost codes, Funding, and Cash flow. Typing an original amount does not award a bid and does not approve a change order. Committed comes from an award. Changes come from an approved change order.

Cost codes

  1. Click Cost codes. This view is already selected.
  2. If the table is empty, click + Use standard cost codes to drop in the starter set, or click + Add line for one line. The header button Add Line brings you to this view. It does not open a separate window.
  3. On the new row, set the cost code and type the original amount. For a demo line, use cost code 011000 (General Conditions) and an original of 25000.
  4. Leave Committed blank if a bid will fill it. After you award that code on the Bids tab, the cell can show linked. If it shows the awarded total with a link you have not applied, click that link to copy the awarded number in. You can still type over it.
  5. If several lines have an award and an empty original, click Use committed as baseline. That copies Committed into Original only on lines that have no original yet. It does not touch lines you already typed.
  6. Click Sync committed from bids when you want every linked cost code’s Committed cell reset to the awarded total. Lines with no awarded bid are skipped.
  7. Leave + CO alone. It fills from approved change orders only. A pending change order does not appear here.
  8. Type Actual when an invoice is paid. Actual does not submit a draw and does not approve a pay application.
  9. Read Projected. It fills itself. Type in that cell only to override it. Read Variance on the totals row. That is projected cost against the revised budget.

Funding

  1. Click Funding.
  2. At the top, under Construction loan, type Loan amount (commas are allowed, such as 1,200,000) and Lender name. Click Save loan. That amount is the facility Draw Requests bill against. Remaining balance on Draw Requests is this number minus funded draws. If the loan is sold, change the lender name here. Draws already saved keep the lender they were created with.
  3. Every cost-code line starts at 100% loan. Draw Requests will bill the lender for that full amount until you change it.
  4. On the General Conditions line, set Loan % to the share the loan covers, and put the rest on equity or the other source so the row totals 100%. A row that does not add to 100% is marked. That row’s loan share is what a draw will request. A line at 0% loan is skipped on draws. The rest is not billed to the lender.

Cash flow

  1. Click Cash flow.
  2. Set Starts month. 0 is the project start month. 1 is the next month.
  3. Set Lasts (months). The chart is blank for a line that has no duration.
  4. If the same cost code already has dates on Schedule, click the link on that row to copy those dates. You do not have to retype them. Copying dates does not move the task on the schedule.

Change Orders

Click Change Orders. The cards at the top are Pending, Approved, Rejected, and Net schedule impact. A new change order is saved as Pending. Pending does not move the budget. The Budget + CO column updates only after you click Approve on that change order. Cost code and title are required. Everything else can be typed, or filled in by Parcl9.

There are two ways in. The label at the top of the form is This change order was…. Received from contractor is already selected. That is the path for a change order a contractor sent you. Issuing to contractor is the path for a change order you are writing and sending.

Received from contractor

Use this when the contractor already wrote the change order and you are logging it. The window title is Change Order Review. The helper under the toggle says: log a change order a contractor sent you, then approve or reject it.

  1. Click + New Change Order.
  2. Leave Received from contractor selected.
  3. Under Change order document (optional), upload the contractor’s file. The hint under that field says “Upload the signed CO / contractor’s written request.”
  4. Leave Schedule of Values (optional) empty unless this change order also came with a payment schedule. The hint says to attach an SOV when the change order affects a payment schedule.
  5. Click Review with Parcl9. The line above the button says it reads the change order document, and the schedule of values if you attached one, and fills the fields below. The button changes to Reviewing… while it works. Nothing is saved yet. The note under the button says the fields are pre-filled for you to review and edit, and nothing is saved until you click Create.
  6. If you have an email or a note that is not in the PDF, paste it in the box labeled Optional — paste additional context (email, notes)… before you click Review with Parcl9. If you click the button with no file and no pasted text, the form says: upload a change order document above, or paste details below.
  7. Check the filled fields: title, reason, cost impact, schedule impact, cost code, and contractor. Change anything that does not match the contractor’s document.
  8. Cost code is a menu. It is required. If Parcl9 left it on — Select —, open the menu and choose the code.
  9. Trade / contract (optional) can stay on — None —.
  10. Title is required. Do not leave it blank.
  11. Click Create change order. Click Cancel if you want to close without saving.
  12. The new row is Pending. Open Budget. The + CO column for that cost code has not changed.
  13. Come back to Change Orders and click the row. Read the note. It tells you that approving will add the cost impact to that cost code’s +CO total in Budget.
  14. Type a decision note if you want one. A note is required only if you click Reject.
  15. Click Approve. Open Budget again. + CO on that cost code now includes this change order. Rejected and still-pending change orders stay out of that column.

Issuing to contractor

Use this when you are writing the change order and sending it. The window title switches to Issue New Change Order. Parcl9 generates the PDF. You do not upload a change-order document on this path. You can attach a schedule of values, and that file goes out with the generated PDF. The schedule of values is not a pay application, and it does not request payment.

  1. Click + New Change Order.
  2. Click Issuing to contractor. The helper changes to: create a change order you are sending to a contractor to formalize a scope change.
  3. Click Title and type a short name for the change. Title is required. Preview will not run without it. The error is “Add a title first.”
  4. Open Trade package / contractor and pick the awarded bid this change belongs to. The line under the menu then shows the cost code and trade taken from that bid. Cost code and contractor are set together. You do not type them separately.
  5. If that bid is not in the menu yet, choose No approved bid yet — enter manually…. Then set Cost code, optionally the trade, and type the contractor. Click Choose approved bid to go back to the menu.
  6. Under Schedule of Values (optional), attach a schedule-of-values PDF when this change should go out with one. That file is sent with the generated change-order document. It is not a pay application, and it does not request payment for the change.
  7. Click Reason / scope and type why the scope is changing.
  8. Click Cost impact ($) and type the dollar amount. A negative number is a credit. The placeholder says “0 (negative = credit)”.
  9. Click Schedule impact (days) and type how many days this adds or removes. Leave it blank if the schedule does not change.
  10. Current completion date (optional) can stay empty. If you set it, the generated document shows the new completion date after those days are added.
  11. Optional: click Draft with Parcl9. It reads the title, reason, and the other fields you already typed and polishes them. The note says nothing is sent until you click Send. Click the ✕ on that panel to hide it.
  12. Click Send to and type the contractor’s email. Press Enter, or click Add. The address has to contain an @. Leave Signature required unchecked unless that person must sign. It starts off. Send stays off until there is at least one address. The button then reads Send to 1 (or the number of addresses).
  13. Click Preview. A PDF opens. This is the change order Parcl9 generated, with the schedule of values going out beside it. Close the preview when you have read it.
  14. Click Send to 1 to email it. The next screen says Change Order Sent and lists the recipients. Click Done.
  15. Or click Save Draft instead of Send. That stores the change order without emailing it. The button’s hint says you can send it later from the list. It is still not in Budget.
  16. Click Cancel to close the window without saving.
  17. When you are ready for the dollars to hit the job, open the row and click Approve. That is the click that adds the amount to Budget + CO for the cost code on the awarded bid.

Draw Requests

A draw bills the lender for the loan-funded share of the work. Saving a draft does not mark it funded, and it does not pay a contractor. Sending the package is what submits it — there is no separate Submit button. Drawn to date counts funded draws only. A cost code that is 100% equity on the Funding view is not billed to the lender. Contractor bills belong under Pay Applications.

  1. Add cost codes on Budget, set Loan amount and Lender name on Budget → Funding, and set each line’s Loan %, before you open this tab. If you skip the cost codes, the empty list says to add them first, then start a draw and click Save Draft.
  2. Click Draw Requests. Read the four cards: Loan amount, Drawn to date, Remaining balance, Retainage held. Filter with All, Draft, Submitted, Approved, Funded, or Rejected.
  3. Click Draw settings. These are starting values for new draws, not the loan itself. Type Default retainage % (it starts at 10), Default lender email, and optionally the inspector name and email. Click Save. Lender and inspector are then copied onto each draw, so a loan sale or a different inspector later does not rewrite packages already saved. Loan amount and current lender name stay on Budget → Funding. Click Cancel or the ✕ to leave the old settings.
  4. Click + New Draw Request. The button reads Opening…. The window title is New draw request, with an Unsaved badge. Nothing is on the list yet. Click ✕ or Cancel and nothing is created.
  5. Set Period start and Period end. Check Retainage %, Lender name, Lender email, and the inspector fields. They start from Draw settings and Funding.
  6. Under Line items, each cost code is a row. The column is This draw % by default — cumulative percent complete as of this draw. The box shows the prior percent as a hint. Click $ in that column header to type this period’s payment due instead, after retainage. Click % to go back. A line that is partly equity shows a note that only the loan-funded share bills the lender. Read Total requested this draw at the bottom of the table.
  7. Click Save Draft. That assigns the next Draw # and puts the row on the list as Draft. Close without that button and nothing is created. After it is saved, change percents or amounts and click Save line items. Change dates, retainage, or contacts and click Save details. If those buttons are not in view, scroll up in the window — the line-item table sits under the inspector fields.
  8. Under Backup documents, click Attach files (or Add files if some are already there). Receipts, invoices, lien waivers, and photos of completed work go out with the draw package email. Click Remove on a file you do not want. Attachments can still be added after the draw is submitted.
  9. Optional: click Run Readiness Check under AI Draw Readiness Check (optional). Read the summary. Fix what it flags, then click Re-run. The check does not send the draw.
  10. In Draw package, lender and inspector are listed under Send to so you do not forget them. Email starts unchecked on both. Check the people who should get this package. Type another address and press Enter, or click Add, if you need someone else. The inspector is not emailed unless you check them. Send to lender stays off until at least one Email box is checked. If you have unsaved line-item edits, the hint says to save them before sending.
  11. Optional: under Message (optional), type a note for the lender — an inspection date, a comment on a line, anything they should know. Leave it blank and the email still includes Draw #, the amount, retainage, and the attached PDF. Your note sits after the greeting, before that auto body.
  12. Click Preview package on the left of that row. The window titled Package preview walks through the email (To, subject, and letter), the Draw Request PDF, then each backup file. Use the tabs, or Previous / Next. Close with the ✕. Preview does not send anything.
  13. Click Send to 1 (or the number of checked addresses) on the right of that row. That emails the package and submits the draw. The status becomes Submitted. Drawn to date does not change.
  14. After it is sent, the same block shows who it went to. To send again, check the people under Resend to — Email is checked only if that address was on the original send — type a note if you want one, click Preview package if you want to reread it, then click Resend to the count.
  15. When the lender decides, open the draw. Lender decision notes are required if you click Record Rejection. Click Record Approval or Record Rejection.
  16. After the money arrives, open the approved draw. Check Amount actually funded. It starts as the amount requested. Click Mark Funded. That is the click that adds the amount to Drawn to date and lowers Remaining balance.
  17. Click Reopen as Draft on a rejected draw to undo that decision and edit the same record. Click Delete only on a saved draft that should not exist. Submitted, approved, and funded draws cannot be deleted. To remove a submitted one, record a rejection, reopen it as a draft, then delete.

Pay Applications

A pay application is the contractor asking to be paid. Logging one does not pay them, and it does not create a draw. Approving one does not move Budget + CO. To put the progress onto a lender draw, you apply it to a draft draw after you approve it.

  1. Click Pay Applications. All is selected. Click Pending, Approved, or Rejected to filter. A note counts how many are awaiting review.
  2. Click + Review Pay Application.
  3. Enter the contractor, the pay app number, and the period.
  4. Click + Add line once per cost code and type the amount requested. Or click the button that reads the contractor’s form into lines. You need at least one line. If you try to log with none, the form says “Add at least one cost code line.”
  5. Click + Log Pay Application. The status is Pending. Budget does not change. Click Cancel to close without logging.
  6. Click the row. While it is pending you can edit the lines and click Save changes. That saves the lines. It does not approve them.
  7. Click Approve, or click Reject and type the rejection notes. The notes stay on the record.
  8. On an approved pay app, the label is Apply this pay app’s progress to a draft draw. Choose the draw in the menu and click Apply. Apply stays off until a draw is chosen. If there is no draft draw, the hint says to create one under Draw Requests first. Applying does not mark the draw funded.
  9. If the contractor sends a corrected copy after a rejection, click + Log Follow-up. That is a new record. The rejected one stays rejected. Click Reopen as Pending only when you need to undo your own decision on the same record.

Permits

Logging a permit does not add a milestone to the schedule. Check Schedule only compares the two. It does not move a task.

  1. Click Permits. All is selected. Click Needs Attention for permits that are expiring, delayed since submission, or missing an inspection. The other buttons filter by one status: Not submitted, Submitted, Under review, Approved, Issued, Expired, Closed, Rejected.
  2. Click + New Permit. The window title is New Permit.
  3. Optional, and usually faster: click Auto-fill with AI — upload the permit, approval letter, or inspection report. Choose the PDF or photo. The button reads Reading document…. Check every field it fills. A warning line starts with a warning mark when something needs a look. Nothing is saved until you click Log Permit.
  4. Permit type is required. Choose one: Demolition, Grading / Earthwork, Building, Mechanical, Electrical, Plumbing, Certificate of Occupancy, or Other.
  5. Set Status. A permit you have not filed yet stays Not submitted.
  6. Type the Permit number if the city has issued one. Leave it blank if you are only logging the intent to apply.
  7. Set the submitted date, issued date, and inspection date if you have them.
  8. Click Log Permit. Click Cancel to close without a row.
  9. The other way in, when the city is connected: click Search City Records (the button may name the city). Type the address, run the search, and click the import button on the matching record. A record that is already imported cannot be imported again. Open that permit later and click Refresh to pull the city’s latest status. Refresh updates the status fields. It does not create a second permit.
  10. Click Permitting Guide to read the usual order of permits for this kind of job. Click Check Schedule after at least one permit exists, to see which dates disagree with the timeline.
  11. Click a row to open Edit Permit. Change the status when the city acts, then click Save Changes. Click Delete only if the row should not exist.

Field

Click Field. Five buttons sit under the tab. Logging any of them does not change Budget and does not move a schedule bar. Linking a punch item or an RFI to a task only stores the link.

Daily Reports

  1. Click Daily Reports.
  2. Click + New Report. The window title is New Daily Report.
  3. Date is required. Set it to the day the work happened, not the day you are typing.
  4. Crew count is optional. The placeholder is “e.g. 8.”
  5. Weather is optional. The placeholder is “e.g. Sunny, 72°F, light wind.”
  6. Work performed is required. The placeholder is “What was done today — trades on site, tasks completed, progress notes.” Log Report stays off until this box has text.
  7. Delays / issues, Visitors, and Equipment on site are optional. Add photos under Photos if you have them. Photos are not required.
  8. Click Log Report. Click Cancel to drop it. The list counts how many reports are logged. Click a row to read it, then Edit, and Save Changes. The window title on an existing report is Edit Daily Report.

Punch List

  1. Click Punch List.
  2. Click + New Item.
  3. Title is required. Add Item stays off until the title has text.
  4. Location placeholder is “e.g. Unit 2, Kitchen.” Trade placeholder is “e.g. Electrical.” Assigned to placeholder is “e.g. ABC Electric.” Set a Due date.
  5. Priority is Low, Medium, or High. Status starts at Open. The other statuses are In Progress, Resolved, and Verified. Leaving it Open means it is not done.
  6. Description is “What needs to be fixed and why.” Gantt task, Cost code, and Permit are optional links. Choosing them does not move the task or the permit.
  7. Add photos under Photos (before / after) if you have them.
  8. Click Add Item. Click the row later, set Status to Resolved when the work is finished, and click Save Changes. Resolved is not the same as Verified.

RFIs

  1. Click RFIs.
  2. Click + New RFI.
  3. Subject is required. The placeholder is “e.g. Clarify beam size at grid line 4.” Log RFI stays off until the subject has text.
  4. Question placeholder is “What do you need clarified or decided?” Type the question.
  5. Submitted to placeholder is “e.g. ABC Architects.” Submitted by placeholder is “e.g. Site super.” Set Date submitted and Needed by.
  6. Leave Response empty until an answer exists. The placeholder is “Answer received, once available.” Set Date answered when you fill it in.
  7. Link a Gantt task or a Permit if this question is holding that work. The link does not pause the task.
  8. Attach files under Drawings, photos, response docs… if you have them.
  9. Click Log RFI. Open it when the answer arrives, type the response, and click Save Changes.

Submittals

  1. Click Submittals.
  2. Click + New Submittal.
  3. Title is required. Log Submittal stays off until the title has text.
  4. Type the Spec section if you have one. The placeholder is “e.g. 05 12 00.” Open Type and choose Shop Drawing, Product Data, Sample, or Other. For the hood drawing, choose Shop Drawing.
  5. Description placeholder is “What’s being submitted and why?” Submitted to is who has to review it. Status starts at Draft. Change it to Submitted when you have actually sent it. Logging it as Draft does not tell anyone it was sent.
  6. Attach the file under Shop drawings, product data, response docs…. A submittal can be logged without a file, but the reviewer then has nothing to open.
  7. Click Log Submittal.
  8. When the review comes back, open the row. Set Status to Approved, Approved as Noted, Revise & Resubmit, or Rejected. Type Reviewer notes. Set Date returned. Click Save Changes. If the status is Revise & Resubmit, raise Rev # when you log the next copy, then set Status back to Submitted.

Photo Log

  1. Click Photo Log.
  2. Click + Add Photos. The window title is Add Photos.
  3. Set Date and Location. The location placeholder is “e.g. Unit 2, Kitchen.”
  4. Attach at least one photo. Add to Log stays off until a photo is attached. A date and a location without a photo are not saved.
  5. Click Add to Log. These photos stay on the project. They are not the same upload as a Construction Progress Analyzer run, and they are not attached to a daily report unless you also add them there. Open the row later and click Save Changes if you need to correct the date or the location. The window title on an existing entry is Edit Photo Log Entry.

Documents

A file in Documents is storage. Uploading it does not analyze it. Drawing Analysis, Document Analysis, and the change-order form each have their own upload. Use this tab when the file has to be found again on the project.

  1. Click Documents. The first visit on a new project sets up the folder. Wait until the file list appears. If the screen says document storage is on a higher plan, the upgrade button on that screen is the only action. The list will not load.
  2. Click New folder, name it, and open it before you upload, if these files need their own place. Uploading while you are at the top level puts the files at the top level.
  3. Click Upload and choose the files, or drag them onto the area that says Drag files here or use the Upload button. The button reads Uploading… until they finish. A failed upload does not leave a usable file.
  4. Click the file name to open it.
  5. When a drawing or a contract is revised, open that file’s menu and click Upload new version. The new file replaces what people open. The previous issue stays on the same file. Uploading the revised PDF with Upload instead creates a second file. It does not version the first one.
07

Construction Progress Analyzer

Compare the drawings with site photos and get a progress assessment.

Construction Progress Analyzer compares what was drawn with what is built. Site photos are required. The drawing is optional, but the assessment is weaker without it. Stay on the page after you submit. It can take up to 30 seconds. Analyze Construction does not log a daily report, does not add a punch item, and does not move the budget.

Name the visit

  1. Click Project Name. This field is optional. Type something you will recognize later, such as “Main Street Renovation – Phase 2”.

Add the drawing

The left box is Blueprint / Drawing (Optional).

  1. Leave the Upload tab selected.
  2. Click the box that says Drag & drop or click to upload, or drag a file onto it. Accepted files are PDF, a ZIP of PDFs, JPEG, PNG, and WebP.
  3. Use a ZIP when the photos cover more than one trade, so the structural, HVAC, and plumbing sheets go in together.
  4. If the drawing is already stored, click From File Manager, then click Load My Files, click the file, and leave it selected. Click Clear if you picked the wrong one.
  5. If you uploaded from your computer and want a copy kept, check Save drawing to File Manager.

Add the site photos

The right box is Site Photos. This one is required. Photograph the same work the drawing shows.

  1. Leave the Upload tab selected.
  2. Click the box that says Drag & drop or click to upload and choose the photos, or drag them on. JPEG, PNG, and WebP are accepted. The box states how many photos your plan allows.
  3. Or click From File Manager, click Load My Files, and select the photos.
  4. Check Save uploaded photos to File Manager if you want the new photos stored.

Run the assessment

  1. Click Additional Context. This is optional. Type what the photos cannot show, such as “Focus on the electrical rough-in. The framing was done by a different crew last week.”
  2. Click Analyze Construction.
  3. Wait on the message Analyzing your images… This may take up to 30 seconds. Do not close the tab. If a red notice appears, read it, fix the missing photo or file, and click Analyze Construction again.
  4. Read the result: the completion estimate, anything flagged as a defect, and the recommended next steps. Use that list on the next site walk.

Open an older assessment

  1. Scroll to Your Previous Analyses.
  2. Click an analysis to open it.
  3. To delete some, check their boxes, or click Select all, then click Delete selected.
08

Home Asset Registry

Keep a record of appliances, fixtures, and materials, including maintenance.

Home Asset Registry is the list of what is in the house. The four numbers under the title are Total Assets, Tasks Due / Overdue, Due This Month, and Properties. Click Tasks Due / Overdue when that number is not zero. Those are the maintenance items to do first. Saving an asset does not create a Workspace budget line and does not schedule a contractor.

Add one asset by hand

  1. Click + Add Asset.
  2. Optional, and usually faster: click Scan Now. Take or choose a photo of the label, the invoice, or a PDF cut sheet. Wait while the details fill in. You can still correct every field below.
  3. Click Category and choose one. This field is required. The item-type list stays on — Select Category First — until you do.
  4. Click Item Type and choose the type. This field is required.
  5. Click Make / Brand and type the brand, such as Bosch or Kohler.
  6. Click Model and type the model name or number.
  7. Click Custom Label if you want your own name, such as “Master Bathroom Faucet”.
  8. Click Location and type where it sits, such as Kitchen or Basement.
  9. Click the property control. Choose an existing property, or choose — Select or Add Property — and type a new property name.
  10. Click Purchase Price if you know what it cost.
  11. Click the notes box and type finish, color, or install notes.
  12. Click Save Asset. The asset appears in the list.

Find an asset later

  1. Click the search box that says Search assets by name, make, model, location… and type any of those.
  2. Click the asset’s name to open it.

Import a batch

  1. Click Import. A menu opens.
  2. To pull items out of a bid-scope you already saved, click From Bid-Scope Analysis. Choose the Workspace project, review the list the tool found, and confirm the import. Use Cancel Import if the list is wrong.
  3. To pull items out of drawings or spec books, click From Drawings / Specs. Upload the PDFs or images. Set the property, or leave it for the tool to detect. Review the extracted list, then click Import All. Click Cancel Import while it is running if you need to stop.

Mark maintenance done

Due tasks are listed under the stats. Each row has Mark Done and Reschedule. If nothing is due, the list says All caught up!

  1. Find the task. The row shows the task name, the asset, and where it sits.
  2. Click Mark Done. A window titled Mark Task Complete opens.
  3. Click Cost and type what you spent, or leave it at 0.00.
  4. Click Performed By and choose Self / DIY, Contractor, or Warranty Service.
  5. If you chose Contractor, click Contractor Name and type the company or the person.
  6. Click Notes and type what was done.
  7. Click Mark Complete. Click Cancel to close without recording it.
  8. To move a due date instead of completing the task, click Reschedule. The window is titled Schedule & Alert Settings.
  9. Set Next Due Date. Leave Reminder Enabled on if you want an email. Set Remind Me (days before due). The box starts at 7.
  10. Click Save Settings.
top