Construction RFI Review

Not all construction RFIs are the same: some clarify the documents; others tee up scope, cost, or time. Brixzly classifies the request for information, stress-tests whether it’s a straight answer or a change-order setup, and — if you add the response — reviews how complete the answer is and what to watch next.

RFI (Request for Information)

Upload the RFI document (and optionally the architect’s response) → Brixzly produces:

  • RFI category: clarification, design conflict, substitution request, differing site condition, etc.
  • Legitimacy assessment: Is this a valid question or a change order setup in disguise?
  • Cost/schedule impact: Does the RFI, or the response, create scope/cost/time exposure?
  • Response quality review: Is the architect’s answer clear and complete, or does it leave things open?
  • Recommendation: Accept response as-is / Request clarification / Watch for follow-up CO

Please log in to access RFI Review.

Copyright © 2025. All Rights Reserved

top